Scaffolding company

Our Scaffolding company aims to offer a one-stop-shop to provide clients with a comprehensive service that will prove to be more efficient and cost-effective to them. We aim to supply a service second to none, providing project management throughout the period of work, which means that the client will only have to liaise with one person from our company who will ensure the client’s exact requirements are carried out in an efficient and professional manner.

We have had our Ancillary Asbestos License awarded and have been on some exclusive contracts, all our operatives have medicals, asbestos training and face fits and have all been doing asbestos work for 10 years.

Our scaffolding staff are CISRS inducted and CITB qualified.  Most have extensive experience of working in all kinds of environments as well as the building industry, therefore producing an exceedingly high standard of safety and workmanship. We also have our own asbestos licence and are CHAS & Construction Line accredited.

Our company owners have over 30 years experience in conventional and quick fix scaffolding, working for some of the biggest scaffolding companies, as well as some of the more local ones, on many different projects, and am happy to discuss any requirements you may have and supply free quotations.

All work will be signed off and handed over to the client on completion. We can produce a sample of our Method Statement, Risk Assessment and a copy of our Public and Employer’s Liability insurances for your information if required.

We would be delighted to be given the opportunity to tender for your future projects.  We are also able to offer a schedule of rates for ongoing contracts

Building works

We are on site carrying out modifications to the above property, as detailed in the drawings. You will see the requirement for an extension to house a lift and construction of a new garage as well as some minor internal alterations. We would like to receive your most competitive quotation for these works in accordance with the attached drawings and below specification.

If you have any queries or require a site visit please contact me on the below.

NEW EXTENSIONS – EXTERNAL STRUCTURE
Surface Strip & Foundations

Break up and take up existing pavings, etc as necessary, surface strip the ground areas to remove all vegetation growth and to reduce levels as necessary to suit the new construction as indicated on the drawings and engineers details.

Excavate to form raft foundation perimeter trenches as indicated on the structural engineers details. Include for all preparation and dowelling to existing foundations as indicated on those details.

Provide for and lay reinforced concrete raft foundation construction all as indicated on the structural engineers details.

At suitable stage following the formation of the raft and the raising of the walls above ground level, back fill excavations, in layers if necessary, of selected clean material well consolidated and leave ready for external works specified later.

External Walls

At all junctions of the new external walls with the existing retained walling, provide and install stainless steel wall connector system, as Catnic Stronghold or equal, continuously fixed with non-ferrous bolts and washers. Include for the system ties to be installed at max 450mm vertical centres to receive brick and blockwork. All to be executed in accordance with the manufacturer’s instructions.

After erection of the solid blockwork walling, fill joint between the existing and new walling with polystyrene backing strip and seal externally with suitable polymer based sealant, colour to be agreed. All used in accordance with the manufacturer’s recommendations.

Off the prepared foundations construct new external solid walling comprising 215mm Celcon Standard, or equal approved, blockwork up to dpc line. Above the dpc construct walling in 215mm Celcon Solar, or equal approved, blockwork all in accordance with the manufacturer’s recommendations.

Between the existing dormer front wall and the new lift shaft walling, prepare structure by removing existing roof coverings and construction in conjunction with roofing works specified later and extend up existing front walling off existing eaves line up to the dormer soffit line all tied to the existing structure.

Note: as specified later, all solid blockwork walling to be rendered externally except for the infill between the dormer and the lift shaft walling which is to be tile hung; habitable rooms are to be clad internally with 40mm thermal board on a fixing system incorporating 25mm air space internally.

Mortar jointing to be in 1:1:6 cement/lime/sand mix or as per manufacturer’s recommendations. Include for bed joint reinforcement installed in accordance with the manufacturer’s instructions. Walling externally is to be finished with recessed joints to allow for rendering. Walling internally to be finished with neat flush pointed joints particularly where to be left exposed in the garage and lift shaft.

In constructing the external walling provide and install new solid polythene damp proof course, as Cavity Trays Ltd Premium Caviroll or equal approved, stepped as necessary to maintain 150mm minimum external clearance above the abutting external ground level. Include to connect new damp course to that of the existing building.

Form new door and window openings as indicated on the drawings ensuring all bonding is made with complete or half width units.

Over new window and door openings provide for and install new lintels in accordance with the structural engineers details.

At head of internal face of walling where pitched roofs to be constructed over, provide and install new 100 x 50mm deep softwood timber wall plate to the perimeter walling at suitable line ready to receive new roof.

Externally to all new walling except the small infill panel between the lift shaft walling and the existing dormer structure, prepare new walling and render in 2 coat work to the blockwork manufacturer’s recommendations; render to finish flush with, and generally to match, the existing. Include for all necessary beads, drips, etc for the proper execution of the works.

Externally to the small infill panel between the lift shaft walling and the existing dormer structure install vapour barrier sheet, suitably sized pre-treated timber battens at suitable centres and hang concrete tiles to match the dormer and linked to the existing tiling thereof: existing salvaged tiles to be used if possible to give an aesthetic match. At the vertical line with the main lift shaft walling form a straight weathertight edge and seal to the painted render finish.

Building Quotes

The relevant drawings have been sent to your company in order for you to quote. Please feel free to contact me regarding information on this project before the deadline your estimates must be complete by two weeks prior to the deadline to obtain a chance in these works.

Please provide an estimate regarding the following works: (if some works are not applicable to your company then please ignore)·

New external walls inc cavity ties and dpc,s etc.
Bay window wall, plinths etc
Internal walls mainly gf (excluding std work)
Supply and install appropriate lintels i.e. catlic and rsj
Insulation to external cavity walls to include, please highlight if you prefer not to include this in your quote.

Note: All waste must be removed independently and must comply with statutory requirements.

Generally: Some specifications have not been confirmed in the drawings, please provide your estimate using reasonable priced material specification and highlight in estimate, for example brick specification. Scaffolding will be provided for safe access of works.

External walls: Generally: cavity construction – 102mm facing brick sample to planning authority for sign off before works commence.100mm cavity with isowool hi-cav slabs or dritherm 32 cavity insulation, 100mm celcon solar block to inner skin. Stainless steel twist type wall ties to bs.1243: 1978 (amended) spaced 750mm horizontally, 450mm vertically.
Staggered rows and double up at openings.
Cavity closed at reveals using ‘therma bridge plus’ or similar approved d.p.c / insulation, to be well lapped where meeting horizontal therma bridge plus to be positioned with d.p.c facing outwards.
All external wall d.p.c’s to comply with bs.743 horizontal d.p.c to be provided 150mm min above finished ground level.
Below d.p.c -280 celcon trench blocks or 2 skins of fletton brickwork with 100mm cavity Internal walls: To ground floor – 100mm celcon standard blockwork, with 13mm render and set both sides.